Composite Pipe Repair
Industry: Other
Solution: Process Water and Fire Water
ID: CPR-11-00140
Project summary:
Inspectors at a steel manufacturing facility found a leak on a section of their water pipe. The pipe section was depressurized temporarily, and the area was grit blasted to an SSPC SP-10 Near White metal finish. A 4-layer, high-strength carbon fiber composite was then installed over the reducer to provide a permanent repair for the leak.
- Date of installation: 10/22
- Facility/Location: Ohio
- Applicator: NA Logan
- Products used:
- FRP 110 HT Tack
- FRP 200 Saturant
- CF-500 BD