
Coatings
Industry: Power Generation - Fossil Fuel
Solution: Water-Immersion
ID: CTS-1-00046
Project summary:
A thick-film coating on the hot side of the condenser water boxes at a gas-fired plant was failing. The coating was completely removed and replaced with an immersion-grade coating for long-term repair.
- Date of installation: 3/1/2016
- End user: Power Generation Facility
- Facility/Location: Middletown, CT
- Applicator: A&G Industrial
- Products used:
- FRP Repair Putty
- HP-300 GF