Composite Pipe Repair
Industry: Water & Wastewater
Solution: Water Treatment and Condensate Piping
ID: CPR-7-00170
Project summary:
Inspectors at a water treatment plant found a severe active leak in one of their pipes, in an area that included flanged connections, valves, clamps and pipe supports. After the pipe was taken out of service and drained, applicators sandblasted and applied putty to smooth the repair area. The entire pipe section, including the flanges and clamps, was wrapped in six layers of carbon fiber and an epoxy topcoat was applied. The pipe was returned to service after only three days.
- Date of installation: 10/23
- Facility/Location: New York, NY
- Applicator: CTI
- Products used:
-
GF-300 BDCF-500 BDFRP 120 HT AdhesiveFRP Repair PuttyHP 300 EpoxyFRP 210 HT Saturant